DMY Starts Work On Warrenton Interchange

DMY recently started work at VDOT’s Route 15/17/29 Warrenton Interchange design-build project in Fauquier County. DMY is providing geotechnical field exploration, lab testing, geotechnical analysis and design, and construction support for the Shirley/Dewberry team. The project will replace the existing at-grade intersection of Route 15/17/29, Route 15/17/29 Business and Route 880 (Lord Fairfax Drive) with a grade-separated interchange to improve safety and capacity. Pictured are DMY’s field geologist and drilling crew using DMY’s company-owned CME 55C all-terrain drill rig.