Interstate 66 Active Traffic Management

The $38 million project will install an active traffic management system on a 34 miles stretch from I-66 through Arlington, Fairfax and Prince William counties from the Washington, D.C. line to Route 29 in Gainesville.

 

The system will improve safety and incident management and include new sign gantries, shoulder and lane control signs, speed displays, incident and queue detection, and increased traffic camera coverage. Drivers will see the new overhead sign gantries installed between the Beltway and Route 29 in Centreville.

 

DMY is currently working on this project to provide QC inspection and testing services during clearing & grubbing, E&S controls, MOT, subgrade preparation, backfill, asphalt, concrete, and foundations.  DMY has provided a QC Manager, QC Coordinator, and several inspectors to ensure the proper compliance of the work with VDOT requirements.

 

Project Location  –  Various Locations in Northern Virginia

Project Owner  –  Virginia Department of Transportation (VDOT)

Project Client  –  TransCore ITS, LLC

Project Completion  –  2015 (Projected)

 

 

I-66ATM2

I-66ATM3

I-66ATM5

I-66ATM4

 

 

 

DC Streetcar – H Street, NE/Benning Road Line

This design-build project includes the construction of the western and eastern termini of the route for the streetcar, the overhead catenary that will deliver power to the streetcars, and the Car Barn at Benning Road-26th Street.  The first segment of the project includes laying out the track, utilities, retaining walls, and other associated site work.  The second segment of the project includes the construction of Car Barn building and maintenance yard.

 

DMY has been working on this project providing Quality Control construction materials testing and special inspection services which include field and laboratory testing for soil and aggregate, concrete and grout sampling and testing, and inspection of the bridge deck repair and drilled shafts for pole foundations.   DMY implemented its web-based electronic management and report delivery system – DMY Manager® to efficiently manage the project data.

 

Additionally, DMY prepared and is currently implementing a two level vibration monitoring program on this project for eleven (11) specified facilities along the project alignment.

 

Project Location – Washington, DC

Project Owner – District Department of Transportation (DDOT)

Project Client – Dean-Faccina Joint Venture

Project Completion – 2014

 

 